Location permits: the paperwork before the camera

Counting cash by hand
On a small crew, a share of every budget still moves as cash — which makes receipts, not trust, the thing that survives an audit.

Nothing stops a shoot faster than a location that was agreed verbally. The paperwork is dull, predictable and worth doing early.

Three layers, not one

Crews new to the country usually assume a single permit exists. It does not. There are three separate layers, and each has its own timeline:

  • The national filming approval. Issued centrally, covers the project as a whole, and takes the longest. Script summary, crew list and equipment manifest go with the application.
  • The location consent. From whoever controls the specific site — a ministry, a governorate, a private owner. Separate for each location.
  • The local notification. Police or municipal, often same-week, but it depends on the location consent already existing.

Why the order matters

Each layer wants to see the one above it. Applying for all three in parallel feels faster and usually is not: the local office returns the file because the site consent is missing, and the clock restarts.

Budget six weeks for a straightforward urban shoot and longer for anything near a heritage site, a port, a bridge or a border area. Those categories move to a different queue and the queue is not fast.

What catches productions out

Drone work is the common one. It sits under a separate authority from the filming approval, and a project cleared to shoot is not thereby cleared to fly. Apply for it as a distinct item, early, and plan a ground-based alternative for the shot.

The second is crew composition. If the list submitted with the application changes — and it always changes — the amendment needs filing before the shoot day, not explained at the checkpoint.

What it costs

Fees themselves are modest. The real cost is schedule: a permit that arrives four days late means four days of crew, kit and locations already paid for. That is the number to put in the budget, and it is why the paperwork belongs in pre-production rather than beside it.

How that interacts with payment schedules is covered in getting paid, and the earliest stage of financing in first money.